Modular building solutions for international projects

Dark quick-assembly prefabricated modular house

Factory-prepared building systems

Prefabricated modular houses built around the project.

Compare folding, frame-led quick-assembly and two-storey systems for commercial, residential and operational use.

Modular building manufacturer

From repeatable units to project-led forms.

Wuhan Yarui Prefabricated Building Co., Ltd. integrates design, production, sales and service for prefabricated and modular building projects. YARIS starts with a proven structural family, then coordinates the enclosure, layout, finish and service scope around the intended use.

Factory preparation can reduce site work and make production, packing and delivery easier to plan. Final engineering, installation and compliance remain project-specific.

Since 2011Wuhan-based company
3 systemsFolding, frame-led, two-storey
InternationalExport-aware coordination

System portfolio

Select the right modular starting point.

Each system answers a different requirement for handling, building form and project scale.

Wood-look folding prefabricated house

Folding series

Compact and movable

Focused units for functions where handling and quick deployment matter.

  • Guard rooms and kiosks
  • Temporary offices
  • Project support spaces
Steel-frame quick-assembly modular house

Quick-assembly series

A frame-led system

Structural components and configurable panels support repeatable project layouts.

  • Site and staff buildings
  • Offices and meeting rooms
  • Custom project forms
Two-storey modular building with external balcony

Two-storey series

Build upward

Vertical arrangements increase usable area where the site calls for more.

  • Accommodation blocks
  • Project camps
  • Commercial and mixed-use facilities
Prefabricated steel building frame in production

Project engineering

Coordinate before dispatch

Structure, enclosure, finish and service options are reviewed before production.

  • Drawings and configuration
  • Production planning
  • Packing and installation support
Steel components prepared in the YARIS factory

Production and delivery

A clear route from brief to site.

The team aligns use, quantity, destination and timing before configuration. Drawings and commercial terms are confirmed before factory coordination, quality checks and packing.

  • Share the project brief
  • Configure layout and finish scope
  • Confirm drawings and quotation
  • Coordinate production and checks
  • Prepare packing and installation support

System comparison

Match construction logic to use.

Final structural specification and installation method are confirmed for the selected product and destination.

SystemTypical starting usesKey planning advantage
FoldingKiosks, guard rooms, temporary supportCompact handling
Quick-assemblyOffices, staff buildings, flexible projectsFrame-led configuration
Two-storeyAccommodation, camps, commercial useVertical space planning

Modular building FAQ

Useful questions before project configuration.

Technical scope is confirmed against the intended use, location and local requirements.

What is a prefabricated modular house?

A prefabricated modular house uses factory-prepared structural and enclosure components that are coordinated before delivery and assembled or deployed on site.

How do folding and quick-assembly houses differ?

Folding units prioritize compact handling and focused room functions. Quick-assembly systems use a frame-led component approach that offers more flexibility for building form and repeatable project layouts.

Can modular buildings be arranged over two storeys?

Selected modular systems can be engineered into two-storey arrangements. Access, circulation, structural design and local compliance must be confirmed for the specific project.

What should I send for an initial quotation?

Send intended use, quantity, destination country, room requirements, preferred appearance and target timing.

Plan a modular building project

Start with the use, quantity and destination.

YARIS will help identify a practical structural family and define the next configuration steps.

Discuss Your Project